Product design and requirements decomposition

2026-09-29 3

The design of hot-side components requires transforming usage scenarios into clear design inputs. Interfaces, space, media, temperature changes and maintenance requirements should all be sorted out during the planning stage.

Product development engineering sketch
Product development engineering sketch (schematic)

Extracting design inputs from usage scenarios

Design discussions can start by determining where the component will be installed, which other components it will connect to, and what operating states it will undergo. Listing normal operation, startup, shutdown, and maintenance scenarios separately helps to identify requirements that might be overlooked when considering only one scenario at a time.

分配系统要求到各个部件

The system’s objectives need to be translated into specific requirements that can be met by individual parts or components. Interface dimensions, functional boundaries, and validation criteria should be interconnected. For inputs that are still unclear, a list of items to be confirmed can be created, with designated responsible parties and confirmation deadlines, to avoid assumptions becoming final requirements without careful consideration.

Design reviews can focus on functionality, manufacturability, and validation methods. For conditions that are not yet determined, assumptions and their subsequent confirmation paths should be clarified.

Introducing manufacturing considerations during the planning phase

Manufacturing and testing personnel can check the accessibility of the parts, positioning conditions, and measurement space in advance. Problems resolved during the design phase are more likely to lead to systematic solutions. The discussion results should be reflected in models, drawings, or technical documents, rather than being merely recorded in verbal conclusions during meetings.

Review outputs should be traceable

An effective review should identify issues, make decisions, and arrange subsequent verifications. For projects with multiple possible solutions, reasons for selection and applicable conditions should be explained. This way, when requirements change, the team can determine whether the original decisions remain valid, rather than having to guess the designer’s intentions again.

Process example: Identifying design omissions based on installation constraints

Assume that the dimensions of a component meet the requirements, but the tool cannot reach the connection point after being installed in the system. The problem may not lie in the dimensional processing itself, but rather in the design inputs not covering installation and maintenance scenarios. During the planning phase, considerations such as the installation path, tool access, and proximity directions should be included in the inspections, allowing for the identification of such limitations in advance. The results of these reviews should be incorporated into the interface and structural documents, so that subsequent manufacturing processes do not require temporary adjustments on-site.

Common questions: Can design work begin before requirements are fully defined?

Boundary-based planning can be carried out, but assumptions and items to be confirmed should be clearly identified, along with any decisions that depend on those conditions. If key inputs change, relevant plans need to be re-evaluated.

Key points for verification during implementation

  • Usage scenarios are clear
  • All interface requirements are covered
  • Manufacturing considerations have been communicated
  • Items to be confirmed should be trackable

Once the plan moves into the detailed design stage, it is important to maintain consistency between drawings, models, and technical requirements, avoiding the use of different versions for manufacturing and testing purposes.